Most garment disputes are not about whether goods were made — they are about what counts as acceptable and who is responsible up to which point. AQL 2.5 answers the first; FOB/DDP answers the second. First-time bulk buyers usually know the words but have never seen the clauses in executable form. Here they are, ordered so you can copy them into a contract.
1. What AQL 2.5 actually inspects: sampling and defect classes
AQL (Acceptable Quality Limit) runs on the ISO 2859-1 / ANSI ASQ Z1.4 sampling framework — the industry-standard basis for pre-shipment inspection. The most common apparel convention is Critical defects accepted at 0, Major at 2.5, Minor at 4.0: one critical defect (a broken needle, a safety hazard) fails the whole lot; majors are judged against the 2.5 acceptance line; minor blemishes get the looser 4.0 line.
How to read it, in three steps:
- Step 1: find the sample size. Look it up by lot size under General Inspection Level II. A lot of roughly 1,000–1,200 pieces typically samples 80 pieces; larger lots sample a lower percentage but a higher absolute count.
- Step 2: apply the accept/reject numbers. The same table gives the Ac (accept) / Re (reject) thresholds for Major 2.5 and Minor 4.0 at that sample size. Defects within Ac pass; hitting Re fails the lot — the verdict comes from the table, not from rounding a percentage.
- Step 3: count by definition. Broken needles, sharp points, holes and mould are critical; untrimmed thread ends that do not affect wear are usually minor; shade out of lot tolerance, measurements out of tolerance, wrong care labels and faulty zips are graded major or minor by their impact — the defect classification belongs in a contract annex, not in the inspector's improvisation.
Buyers commonly engage third-party inspectors (SGS, BV, QIMA and similar) to run the final inspection to this bar. As the factory, we also self-inspect to the same bar before shipment and hand the report to the buyer first — when both reports line up, disputes mostly disappear.
2. The three inspection checkpoints: who does what, when
| Checkpoint | Timing | Factory side (us) | Buyer side |
|---|---|---|---|
| Inline / mid-line inspection | After cutting, at roughly 10–20% completion | Submit the approved first sample and the in-line sewing QC records | Optional: remote review or a third-party mid inspection on stitching and shade lot |
| Final random inspection (FRI) | Lot complete, at least 80% packed | Self-inspect to AQL 2.5 and issue the report | Third-party final inspection or accept the factory report; failures mean rework and re-inspection |
| Container loading check (optional) | On loading day | Cooperate with the check, verify carton marks and counts | Optional third-party supervision for high-value or first orders |
One reminder: sampling is a probability tool, not a full check. Every-piece quality comes from process control during production — cut-panel checks, mid-line audits and end-line audits — not from leaning on a sampling table on the last day. That is why we hand buyers the process records broken down by operation: an auditable process is worth more than a flattering final report.
3. FOB versus DDP: where responsibility ends and who files what
The trade term decides where delivery happens, who carries transit risk, and who handles export paperwork. For womenswear the two common points are FOB and DDP:
| Matter | FOB (Free on Board) | DDP (Delivered Duty Paid) |
|---|---|---|
| Export customs and documents | Seller (factory) files export customs and prepares the document pack | Seller handles everything, including destination-country clearance and duties |
| Freight and forwarder | Buyer nominates the forwarder and pays freight | Seller arranges and pays freight |
| Risk transfer point | Goods on board at the port of shipment | Goods delivered to the buyer at destination |
| Import clearance and duties | Buyer's responsibility | Seller's responsibility |
| For a first-time buyer | More control — choose your own forwarder and insurance | Hassle-free, but read the tax-inclusive basis in the quote carefully |
Under either term, the export-side documents are prepared by the seller (factory) — DDP simply adds the destination-country import paperwork on top. Writing the delivery schedule and the trade term into the PI together is the fundamental cure for "goods ready, vessel missing" and "stuck at customs" arguments.
4. The garment export documents checklist (copy into your contract)
For an FOB shipment from a Chinese port, the standard pack is (destination-specific extras aside):
- Commercial invoice — goods, quantities, unit prices, trade term, value: the basis for customs and payment;
- Packing list — carton count, dimensions, gross/net weights, shipping marks: must match the actual loading;
- Export customs papers — customs declaration and HS classification (womenswear garments typically under Chapter 61/62);
- Bill of lading (B/L) or Air Waybill — under FOB, issued to the buyer's nominated forwarder;
- Certificate of origin (CO, or preferential forms such as Form E where applicable) — arranged per destination tariff benefits;
- Final inspection report — issued to the AQL 2.5 bar, often a payment milestone document;
- Label compliance files — care labels, hangtags, barcodes and destination labelling rules (fibre content, origin marking);
- ISPM 15 fumigation — if wooden crating or pallets are used.
Under DDP add: the destination import declaration, duty and VAT payment proof, and destination compliance declarations (e.g. EU textile labelling regulation, US FTC labelling requirements — matched against the destination checklist).
5. The buyer's acceptance checklist: run it before you sign
- Does the contract annex define defect classes (what counts as Major, what as Minor)?
- Does it state the inspection level (General Level II) and acceptance lines for all three classes?
- If third-party inspection fails, how are rework, re-inspection and costs split?
- Does every trade-term abbreviation carry a full place name (FOB + port of shipment, DDP + destination)?
- Is the document pack complete, with issuance timing agreed (e.g. B/L copy within X working days after shipment)?
- Are the final care label, hangtag and barcode artworks signed and sealed by both sides?
These six lines apply to any supplier — and you are welcome to run them against us: the AQL clause and document list written into the PI, quotations broken down by operation, and delivery milestones with responsibilities in writing are how we have always worked with our 307 clients across 59 countries.
Frequently asked
- How does AQL 2.5 decide pass or fail, and how many pieces are pulled from a 1,000-piece lot?
- Look it up under ISO 2859-1 / ANSI ASQ Z1.4, General Inspection Level II: a lot of roughly 1,000–1,200 pieces samples 80 pieces, with the common apparel convention of Critical 0 / Major 2.5 / Minor 4.0. Defects within the table's Ac (accept) number pass the lot; hitting Re (reject) fails the whole lot — the verdict comes from the table, not from a rounded percentage. The defect classification belongs in a contract annex, never in the inspector's improvisation.
- Under FOB and DDP, who handles export customs, freight and duties?
- FOB: the seller (factory) files export customs and prepares the document pack; the buyer nominates the forwarder and pays freight; risk transfers on board at the port of shipment; import clearance and duties are the buyer's. DDP: the seller handles everything including destination clearance and duties, with risk transferring at destination delivery. Under both terms the export-side documents are prepared by the seller — DDP simply adds the destination import files. Always write the full place after the abbreviation (FOB + port, DDP + destination).
- Which export documents does a garment shipment need, and which come from the factory?
- The standard pack: commercial invoice, packing list, export customs papers with HS classification, bill of lading or air waybill, certificate of origin (CO or preferential forms), the AQL 2.5 final inspection report, label compliance files (care labels, hangtags, barcodes), and ISPM 15 fumigation if wooden packing is used — all issued by the factory (seller). DDP adds destination import declarations, duty and VAT proof, and destination compliance statements.
- What if the factory's self-inspection report and a third-party inspection (SGS/BV/QIMA) disagree?
- First check whether the terms matched: sampling level, defect-class definitions and packing completeness at inspection (usually ≥80%) — if any differ, the results are not comparable. That is why we write the AQL clause and defect classes into the PI, self-inspect to the same bar before shipment and hand the report to the buyer first. If a third-party recheck still differs, the contract's rework and re-inspection process applies, with cost sharing agreed in advance.
- Do small orders of about 100 pieces also get an AQL 2.5 report, and how are timelines and documents arranged?
- Yes — from about 100 pieces per style we self-inspect and issue the report to the AQL 2.5 bar, with sample sizes looked up by lot size (smaller lots sample at a higher ratio). Sampling runs about 3–5 days and bulk about 10–20 days, with milestones and the trade term written into the PI; under FOB the B/L copy and the rest of the pack follow within the agreed working days after shipment.