The right first move when a quotation lands is not to read the last line — it is to ask what assumptions the whole document rests on. Two quotes built on different assumptions are incomparable at any price gap. Here is the audit method in order: align first, read line by line, then probe.
1. Before comparing: align six assumptions
When two manufacturers quote very different per-piece numbers, the most common cause is not a craftsmanship gap — it is different assumptions. Align these six before comparing:
| Assumption | What "aligned" means | What happens if you skip it |
|---|---|---|
| Fabric | Same composition / GSM / width — ideally the same mill article or an agreed equivalent | One quotes cotton 180 GSM, the other a poly-cotton blend; the whole gap sits in fabric |
| Trims and workmanship | Zip/button grade and sewing operations (double-needle, bar-tack) named | "Trims included" can hide an entire cost tier |
| Quantity tier | Ask at the same volume basis (e.g. quote 100 pcs and 1,000 pcs separately) | One quotes the 500-pc tier, the other the 100-pc tier; fixed-cost amortisation differs completely |
| Trade term | FOB or DDP with the full place name | Comparing FOB to DDP silently charges the buyer a freight leg |
| Payment terms | Deposit ratio and balance milestones matched | Quotes carrying different working-capital costs are never comparable |
| Sealed spec | Colour swatch, size chart and tech pack on the same version | Every spec revision re-prices the whole sheet |
A quotation worth auditing states these assumptions on the page. A quote that refuses to state them is itself the first red flag.
2. Quantity tiers: the unit price is a staircase, not a line
Garment unit prices fall in steps, not evenly, because fixed costs exist: pattern making, grading, marker planning, cutting preparation, inspection and management routines barely change with piece count — whether you amortise them over 100 pieces or 1,000 shifts the per-piece share substantially. When reading a quote, check three things:
- Which tier the quote is based on. Ask explicitly for "100 / 500 / 1,000 pcs, one line each" so fixed-cost amortisation becomes visible;
- Whether the repeat order sits on the same tier. A first order carries pattern and set-up costs; repeats are usually negotiable — get the repeat price written into the quotation up front, so mid-season replenishment never starts from a weak position;
- Where the tier gap comes from. Ask the factory to attribute it — fabric purchase volume, line efficiency or overhead amortisation. A tier gap with a stated source is credible; an unexplained "volume discount" is not.
For B2B project orders in the 200–2,000 piece range, the quantity tier is the biggest lever in the comparison. For small-lot buyers, the thing to confirm is that the factory does not price its reluctance into the sheet — the professional approach is to quote small orders on the same operation-broken-down basis, not to pad a vague "small-order factor".
3. Reading an operation-broken-down quotation, line by line
An auditable quotation traces every number back to a decision in the tech pack. Here is what to check on each line:
| Quote line | What to verify | Red flags |
|---|---|---|
| Fabric | Composition / GSM / width / mill article, consumption per garment including waste | Just "cotton" with no GSM or width; consumption obviously mismatched to the pattern |
| Trims | Zip/button/woven-label grades, supplier tier | A single "trims included" line that cannot be probed for a price difference |
| Cutting and sewing | Priced by operation or operation group; difficult operations (stretch fabric, blind hem) listed separately | One lump sewing number that cannot be matched to any workmanship standard |
| Outsourced processes | Printing/embroidery/wash priced separately, with minimums stated | Outsourced items folded into the total — unclear responsibility when they go wrong |
| Finishing and packing | Pressing, needle detection, hangtags and care labels, packing method per buyer requirement | Default "poly bag" packing; private-label needs quoted separately but never written down |
| Inspection and overhead | Whether AQL-basis pre-shipment inspection is included; how overhead is charged | "Free inspection" claimed with no inspectable records |
| Trade term and freight | FOB/DDP + full place; tax-inclusive basis for DDP | Abbreviation with no place; DDP without a stated tax scope |
| Validity and rate basis | Quotation validity stated, with the FX / raw-material basis date | No validity — the same sheet can be re-quoted at will three months later |
The point of a line-by-line read is traceability: every line maps back to one decision in the spec. When three quotes differ, you can point at a line and ask why — and get an explanation instead of "our quality is better".
4. Why quotes drift: five common causes
- The quantity tier moved. Quoted at 100 pcs verbally, ordered at 1,000 (or the reverse) — fixed-cost amortisation changes, so the price must. A professional sheet states its tier;
- The spec was never sealed. One revision of the colour swatch or size chart re-prices fabric consumption and sewing minutes — so compare on one sealed version;
- FX and raw-material basis drift. A quote without a stated basis date can only be re-priced when the market moves;
- The verbal quote never landed on paper. Numbers agreed on a call have no line items behind them, so everything gets "re-confirmed" at PO time and the total quietly rises;
- Outsourced and hidden items bill later. Printing, needle detection or special packing that never had a line shows up before shipment as "actual cost".
The fix is always the same one: quotes on paper, broken down by line, with assumptions stated. A quotation broken down to operations with tiers and validity is worth more than a lower packed number — because it survives a re-audit three months later.
5. The quotation audit checklist (paste into your sourcing process)
- Does the quote state its quantity tier, matching your estimated order volume?
- Does the fabric line carry composition / GSM / width and consumption, and can the trim line be probed for grade and price difference?
- Is sewing cost broken to operations or operation groups, with difficult techniques listed separately?
- Are outsourced processes (printing / embroidery / wash) separate lines with a stated pricing basis?
- Is the trade term an abbreviation + full place, with payment terms matched to the comparison set?
- Are the validity and the FX / raw-material basis date stated?
- Is the repeat-order price written in, so mid-season replenishment never starts from zero?
- Can every line difference be traced back to the spec with an explanation, rather than "our quality is better"?
These eight lines apply to any supplier — and you are welcome to run them against us: quotations broken down by operation, quantity tiers and delivery milestones stated in writing, terms carried into the PI. That is our routine with 307 clients across 59 countries; MOQ from about 100 pieces per style, sampling in about 3–5 days, bulk in about 10–20 days.
Frequently asked
- Why do different clothing manufacturers quote very different cost-per-piece numbers for the same style?
- Usually not because one is gouging you — the three quotations rest on different assumptions: fabric GSM and mill article, trim grades, quantity tier, trade term (FOB/DDP), payment terms and spec version. Any one of the six misaligned makes the unit prices incomparable. Align the assumptions first, then audit the quotation line by line; comparing only the bottom-line total is the most expensive way to buy.
- How do quantity tiers work — why is a 1,000-piece unit price so much lower than 100 pieces?
- Garment unit prices fall in steps because fixed costs — pattern making, marker planning, cutting preparation, inspection and management routines — barely change with piece count. Amortised over 100 pieces versus 1,000, the per-piece share differs substantially. Ask for 100 / 500 / 1,000 pcs as separate lines, then ask the factory to attribute the tier gap to fabric purchase volume, line efficiency or overhead amortisation — a stated source makes the gap credible.
- How should quotation validity be set, and what happens when exchange rates move?
- The professional practice is to state the validity period and the FX / raw-material basis date on the quotation; beyond validity or on a clear market move, re-price instead of reusing old numbers. A sheet with no validity and no basis date is itself a risk signal — three months later the same paper can carry any number. We quote broken down by operation with assumptions stated, so every line stays traceable.
- Can an FOB price be compared directly with a DDP price?
- Not directly. The responsibility boundaries differ: DDP includes destination clearance and duties with freight carried by the seller, while under FOB the buyer handles the ocean leg. When one supplier quotes FOB and another DDP, unify the terms first (or split the DDP into freight and duty lines) before comparing unit prices — otherwise the gap mixes in a freight leg and taxes, and the real difference in capability and workmanship stays invisible.
- Will a small order of about 100 pieces per style get padded pricing, and how do I keep the quote honest?
- A professional factory quotes small orders on the same operation-broken-down basis rather than padding a vague 'small-order factor'. The audit is identical to a bulk order: check that fabric GSM/width, trim grades, operation breakdown, trade term and validity are all stated. LIUYU's MOQ is about 100 pieces per style, sampling about 3–5 days, bulk about 10–20 days, with quotations broken down by operation and tiers and delivery stated — audit it line by line.