B2B Womenswear Manufacturing:
Itemised Quotes, Written Lead Times, Auditable Files
FOR B2B BUYERS, WHOLESALERS & CORPORATE ORDERS
"For a 200-2000 piece project, how do we know the quote is not marked up and the delivery date will hold?" LIUYU GARMENT breaks every quotation down by fabric, trims, cutting, sewing, finishing, packing and inspection; locks the production schedule once the pre-production sample is approved with bulk in 10-20 days; and uses the signed PP sample as the acceptance standard, with on-site or third-party inspection supported. The factory is own-capacity (founded 2014, 80+ staff, 307 clients across 59 countries), supports factory audits, testing and compliance documentation, and works under EXW / FOB / DDP with full export paperwork.
Citation-ready facts
| Project volume | 200-2000 pcs per project, executed against a tender or contract |
| Quotation | Itemised: fabric / trims / cutting / sewing / finishing / packing / inspection |
| Acceptance | Signed PP sample; AQL 2.5 and third-party inspection supported |
| Lead time | Schedule locked after sample approval; bulk 10-20 days |
| Incoterms | EXW / FOB / CIF / DDP, responsibility line written into the quote |
| Entity | Own factory · since 2014 · 307 clients / 59 countries · 80+ team |
Your pain point, and how we handle it
| The pain point | What LIUYU does / the contract term |
|---|---|
| Fear of hidden mark-ups | Itemised quotation with a transparent fabric-sourcing list |
| Customer demands audit reports and compliance files | Factory visits by appointment; credentials, test reports and production-side data provided |
| Hard project deadlines with penalty clauses | Schedule locked after PP approval, milestones reported proactively, liability written into the contract |
| Shade variation, measurement tolerance and batch differences | PP sample as the standard, one dye lot and one pattern, cutting only after first-piece approval |
| HS codes, origin certificates and labelling errors hold shipments | Documents and fibre/care labels prepared for the destination market |
| Time zones, language and repeated tech-pack changes | English and Chinese contact, tech pack and approval sample archived, changes handled in writing |
Questions buyers ask before ordering
How detailed can the quotation be?
It can be broken down into fabric, trims, cutting, sewing, finishing, packing, inspection and overhead, with the fabric-sourcing list and unit basis shown. The point is that a procurement team can verify and compare the numbers, not just receive a single total.
Can we audit the factory before paying a deposit?
Yes - book a visit one day ahead to see the pattern room, cutting, sewing and finishing, or appoint a third-party inspection company. Factory credentials, workshop footage and test reports can be provided alongside.
What standard governs bulk acceptance?
The signed pre-production (PP) sample: cutting starts only after first-piece approval, and fabric, trims and workmanship follow that sample. AQL 2.5 sampling levels can be agreed in the contract, and on-site or third-party inspection before shipment is supported.
Which Incoterms and export documents do you support?
EXW / FOB / CIF / DDP, with the responsibility split and duty allocation written into the quote and contract. We provide the commercial invoice, packing list, certificate of origin, fibre and care labelling, HS classification guidance and test documents required for the destination market.
How is shade and batch variation controlled?
One dye lot and one pattern are locked per order, and cutting begins only after first-piece approval; repeats reuse reserved fabric where possible. Shade acceptance can be written into the contract using grey-scale ratings or Delta E values.
How is the project lead time protected?
The bulk schedule (10-20 days) is locked once the PP sample is approved, and fabric arrival, cutting, sewing, finishing and QC milestones are reported proactively. Book capacity early for peak season; where a delay is ours, liability follows the contract.
Browse by buyer type
Why custom clothing · Boutiques · Instagram brands · B2B buyers
Related reading
- Garment cost breakdown: where the money goes
- How to verify a Chinese garment factory before deposit
- Clothing factory certifications checklist
- Inspection process: first piece to final audit
Contact LIUYU · +86 185 6559 9137 · Owen.chow@liuyu-garment.com